Project type
Cleanout, renovation, roofing, yard work or construction/demolition adds context to the likely container size.
Recommendation method
The current engine is rule based—not a provider bidding system and not a black-box AI guess. It compares your project answers against explicit recommendation rules, selects the strongest fit, and then matches providers separately.
What the engine asks
This distinction matters. The size recommendation is driven primarily by project type, debris type, estimated volume and heavy-material risk. ZIP code, rental duration and placement are then used for provider matching, reports and quote-request context.
Cleanout, renovation, roofing, yard work or construction/demolition adds context to the likely container size.
Household, construction, yard, roofing, heavy or restricted material changes which recommendation rules can fire.
Simple pickup-truck-load ranges establish the strongest starting signal for 10, 20, 30 or 40 yards.
A meaningful amount of dense debris can pull the recommendation toward a smaller weight-controlled container.
The current engine uses the project ZIP to filter provider records after the size recommendation is made.
Duration is carried into the personalized report and quote request so provider terms can be compared against the project need.
Driveway, public right-of-way or uncertain placement is carried into the report and provider conversation because access and permit questions may matter.
Rule-based scoring
Each matching rule adds points to one of the candidate outcomes. The highest-scoring eligible outcome becomes the recommendation. Higher-priority safety rules are evaluated before ordinary sizing signals.
1–3 truck loads strongly favors 10-yard; 4–6 favors 20; 7–10 favors 30; more than 10 strongly favors 40.
Cleanouts and renovations add support to 20-yard, while construction/demolition adds support to 30-yard.
Heavy debris or a meaningful heavy portion adds strong support to the compact 10-yard outcome because hauling weight can become the limiting factor.
Restricted material triggers the special-disposal outcome instead of pretending an ordinary roll-off size solves the disposal problem.
Why heavy debris can mean smaller
A 40-yard container can physically hold a mountain of concrete. That does not mean a hauler can safely or legally move it when full. Dense materials can hit weight limits long before the walls of a large container are reached.
What “confidence” means
The percentage shown with a recommendation measures how clearly the winning rule score leads the runner-up under the current model.
It does not mean there is a 96% statistical probability that a particular dumpster will be perfect. It also does not predict provider availability, final price, loaded weight or permit approval.
Recommendation first. Provider second.
After the engine chooses an outcome, that outcome maps to the matching service category—10, 20, 30 or 40-yard—and the directory filters providers by supported size and the visitor's ZIP code.
Trust boundaries
The engine uses a fixed, inspectable rule set. The recommendation is reproducible from the same answers rather than being changed by which provider happens to advertise.
Provider records and public price examples carry source/update information. Exact availability and the provider's current quote still control.
The tool does not determine permit approval, legal road weight, exact debris weight, provider availability or final accepted-material policy.
Quick answers
No. The current production logic is deterministic and rule based. Matching answers add explicit points to candidate outcomes, and the strongest eligible outcome wins.
It is an internal score-separation indicator between the leading recommendation and the runner-up. It is not a statistical probability, quote guarantee or provider-availability prediction.
Because weight can become the real constraint before physical volume does. Dense debris can exceed hauling limits in a large container long before that container looks full.
No. The recommendation is calculated before provider matching. Provider sponsorship or visibility does not add scoring points or change the selected outcome.
In the current engine, the core size score is driven primarily by project, debris, volume and heavy-material risk. ZIP filters provider matches; duration and placement are carried into the planning report and quote-request context.
Answer the project questions, see the recommendation and reasoning, then compare matching local providers separately.